Bulk Handling Simulation
See how material will flow through your chutes, conveyors and shiploaders before steel is cut or settings change
Find the Flow Problem Before You Fabricate
A transfer chute that blocks every wet shift, a liner that wears through months early, a belt that runs off-track because the load lands to one side: these problems usually come down to how the material actually moves. Fixing them by trial and error means shutdowns, fabrication and another wait to see if it worked.
Bulk handling simulation lets you see the flow first. Using the discrete element method (DEM), we model your material particle by particle as it moves through the chute, onto the belt and on to the next transfer point. You can compare the current design with proposed changes side by side, then make the change with more confidence.
We work with engineers, operations and maintenance managers at ports, bulk terminals, coal handling plants (CHP) and mines. We work with companies in Australia and across Asia.
What We Do
Simulation and data work for conveyor chutes, transfer points and ship loading.
DEM modelling of chutes and transfer points
Conveyor and chute flow analysis
Shiploader flow simulation (in development)
Operating data in one place
Common Problems We Help With
Most chute and conveyor problems show up as downtime, clean-up or maintenance cost long before anyone models the flow.
Chute blockage and build-up
Material slows where it changes direction, lands on a flat surface or is squeezed into a narrower section, then builds up until the chute blocks. A simulation shows where flow slows, so the fix goes in the right place rather than on another round of trial and error.
Liner wear
Wear concentrates where material hits hard or slides fast. The simulation marks those impact and sliding zones, which helps when choosing liner materials and positions, and when comparing how a design change moves the wear.
Spillage and dust
Spillage and dust often come from material landing on the belt with too much speed, at the wrong angle or off-centre. Seeing the stream leave the chute shows why, and whether a proposed change brings it under control.
Off-centre belt loading
If the chute drops material to one side of the receiving belt, the belt can run off-track and spill. The simulation shows where the load lands across the belt width, for the current design and any proposed change.
Loading rate below rated capacity
The rated tonnes per hour is rarely what you get over a whole shift or ship. Some losses are in the equipment, others are in the sequence: hatch changes, trimming, waiting for feed. Flow simulation and your operating data together show where the time goes.
How a Simulation Study Works
What we need from you, what you get back, and the steps in between.
What we need
- Drawings or a 3D model (STL or similar) of the chute and the belts around it
- Belt speeds and widths, and design and actual throughput
- Material properties: particle size, moisture, bulk density, and samples or test results where you have them
- Operating records: blockage history, liner change-outs, spillage and downtime
What you get
- Flow animations of the current design, from several viewpoints
- Build-up, impact and wear zones marked on the chute
- Where and how the load lands on the receiving belt
- A before-and-after comparison of each proposed design, with a short written summary
Free initial chat
You tell us about the chute, conveyor or loading problem and what you have tried. We tell you plainly whether a simulation is likely to help.
Gather the inputs
We work from your drawings, operating data and material information, and agree with your engineers which conditions to test.
Model the current design
We simulate the chute as it is today and check the result against what you see on site, such as where build-up and wear actually occur.
Test the proposed changes
We run each proposed design under the same conditions and show the results side by side, with animations and a written summary your engineers can use.
A simulation supports your engineers' decision. Final design, structural checks, fabrication and sign-off stay with the site's engineers.
Simulation Videos
Before-and-after flow simulations: the current design next to a proposed change, under the same conditions.
Transfer chute flow simulation: current and proposed design
A DEM simulation of material falling through a transfer chute onto a belt conveyor. The current chute is on the left and a proposed design on the right; particles are coloured by speed, from blue (slow) to red (fast). In the current design, material slows and crowds at the bottom of the chute where it meets the belt. In the proposed design it leaves the chute travelling with the belt.
More before-and-after comparisons are being added, covering other chute and conveyor problems. Have a chute you would like to see modelled? Tell us about it.
Guides & Articles
Plain-English explanations of chute flow analysis and DEM simulation.
Transfer Chute Flow Analysis: A Plain-English Guide
What transfer chute flow analysis is, how simulation shows blockages and wear before steel is cut, and the data that makes the results reliable.
The Discrete Element Method (DEM) Explained
How DEM simulation models bulk materials particle by particle, what it is good for, and where its limits are.
Why Kenomont
- We build the simulations ourselves. The transfer chute flow simulation above is our own work, from geometry and material set-up through to the before-and-after comparison.
- We know port operations. We have run port systems for a woodchip export facility since 2012, receiving ticket data from the site's weighbridge system since 2015. See the forestry export case study.
- We are vendor-neutral. We don't sell chutes, liners or conveyor equipment, so the simulation answers the question rather than making the case for a product.
- We connect the flow to the numbers. Alongside simulation, we bring throughput, weighbridge and maintenance data together so you can see whether a change actually paid off.
Bulk Handling Simulation FAQs
Tell Us About Your Chute or Conveyor
Describe the problem and the equipment involved. We'll tell you honestly whether a simulation is likely to help and what we would need from you.
Email is the easiest way to send drawings or videos. Australian callers can also ring the 1300 number below.
Free initial chat. No sales pressure - if we're not the right fit, we'll say so.
Prefer to talk? Call 1300 470 091
Got a spec or files? Email [email protected]