Construction KPI Dashboards, Connected to Your Systems

The numbers that run a building business, refreshed from your systems, without anyone rebuilding a spreadsheet. We integrate job costing, estimating, timesheets and your accounts into one construction dashboard.

  • 20+ years connecting business systems
  • Works with the accounting, job and CRM systems you already use
  • Fixed quote after a free chat
Talk it through with us, freeA no-obligation chat about your systems. Honest answer, even if we're not the right fit.
Book a free chat1300 470 091
Construction KPI dashboard showing job margins and cash

Know Where Every Job Stands

Most builders know their jobs well but find out how the business is really doing too late: at month-end, at the end of the job, or when the accountant prepares the year-end figures. The numbers exist, but they are spread across the job or estimating system, the accounting software, timesheets and a few spreadsheets.

We bring them together into a small set of construction KPIs your team can see every week: cash, progress claims outstanding, budget versus actual by job, committed costs not yet invoiced, and what is coming up. The dashboard updates itself from the systems you already use, so nobody spends Monday morning rebuilding it. If you're still deciding which numbers matter, start with our list of construction KPIs builders should track, with how each one is calculated.

Built and supported by Kenomont, with 20+ years building business systems, including executive reporting dashboards for forestry operations and a forestry export platform we have run since 2012.

Construction Dashboard Integration: Where the Numbers Come From

A construction dashboard is only as good as the systems feeding it. No single system holds every number, so the real work is integrating them and matching each one to the same job.

Job costing

Budgets, costs to date, approved variations and committed costs from purchase orders and subcontracts.

Estimating

The original estimate for each job, so you can see where actual costs are drifting from what you priced.

Timesheets

Labour hours and cost by job, often the first number to run over and the last to reach the accounts.

Accounts

Bills, payments, progress claims, retentions and the bank balance from your accounting software.

The thread that ties them together is a job code used the same way in every system. Once that's in place, budget versus actual, committed costs, claims and cash all line up by job, and the dashboard updates itself.

Signs Your Numbers Are Arriving Too Late

One or two of these is normal. Several at once means decisions are being made without the numbers.

  • You find out a job lost money after it has finished
  • The weekly or monthly report is rebuilt by hand from several exports
  • Nobody can say quickly how much is owed in progress claims and retentions
  • Costs are committed through purchase orders and subcontracts but not visible until the bill arrives
  • Job managers keep their own spreadsheets because they don't trust the official numbers
  • Cash surprises arrive even though jobs look profitable
  • Different people quote different numbers for the same job
  • Reporting depends on one person who knows how it all fits together

Ways to Get Reliable KPIs

Start with the reports you already have, and add only what is missing.

Use the reports you already have

Your job management system and accounting software already include useful reports. Sometimes better job codes and a consistent weekly routine are all that is needed. We check this first.

A reporting app on top of your accounting software

For financial KPIs from the accounts alone, reporting apps do a good job at a modest monthly cost. They can't see job budgets, committed costs or claims held in other systems.

A connected construction dashboard

Job budgets, variations and claims from the job system, costs and payments from the accounts, and labour from timesheets, matched by job and updated automatically, so everyone works from the same numbers. Learn more

Cash flow from your claim schedule

Forecast cash from progress claims, retentions and committed costs rather than last year's averages, so you can see the tight weeks coming. Learn more

How We Set It Up

Built around the numbers you actually use, not a generic template.

1

Agree the handful of KPIs that matter

Usually cash, claims, budget versus actual, committed costs and milestones. We start with what you would look at every Monday.

2

Find where each number lives

Usually some mix of the job system, the accounting software, timesheets and spreadsheets. We map each number to its source and agree a single job code that ties them together.

3

Clean up the basics

Job codes used consistently, costs coded when they are entered, and budgets updated for approved variations.

4

Build and check the dashboard

We connect it to your systems and check it against your own figures until your team trusts it.

5

Hand over and support

Your team uses it every week; we keep it running and add to it as the business changes.

Construction KPI FAQs

Start with five: cash position, progress claims outstanding, budget versus actual by active job, committed costs not yet invoiced, and upcoming milestones. Add others, such as labour utilisation or safety, once these are reliable every week.

Connecting each system that holds part of the picture and matching them on a shared job code: job costing (budgets, costs to date, committed costs), estimating (the original estimate, so you can compare it with actuals), timesheets (labour hours and cost by job) and your accounting software (bills, payments, claims and cash). Most of the work is agreeing that job code, mapping cost codes between systems, and checking the dashboard against your own figures until the team trusts it. Where a system has an API we pull from it automatically; where it doesn't, a scheduled export usually works.

Accounting software such as Xero or MYOB covers the accounting side (cash, receivables, profit by tracking category or job). It doesn't hold job budgets, variations or committed costs, so construction KPIs usually need the job system's data as well.

Not necessarily. Some businesses only need better use of the reports they already have. When data from several systems needs combining, a tool such as Power BI is a good option, but the right choice depends on your systems and who will use the reports.

Daily is common, so the Monday view is current without anyone refreshing it. The accounting side is only as current as the bills and claims entered, so good entry habits matter as much as the dashboard.

It depends on how many systems are involved and how much clean-up is needed. We look at your setup first and give you a fixed quote after a free initial chat.

Related: Which construction KPIs to track (12, with formulas) · WIP reporting for builders using Xero · Construction WIP reporting · Construction industry

Want a KPI Dashboard That Builds Itself?

Tell us which systems you use and which numbers you're missing. We'll tell you honestly whether better use of your existing reports will do, or what a connected dashboard would involve.

What happens next
  1. We read your message and reply within one business day.
  2. If it helps, we book a free chat (usually 30 minutes) about your systems and what you're trying to fix.
  3. You get an honest view: whether we can help, roughly what's involved, or who'd be a better fit.

Free initial chat. No sales pressure - if we're not the right fit, we'll say so.

Prefer to talk? Call 1300 470 091

Got a spec or files? Email [email protected]

Name, email and message are required. We reply within one business day.