Timesheet Template and Approval Process for Labour Hire and Trades

26 November 2026 Aaron Chambers Systems Integration, Business Strategy

A good timesheet does two jobs: it gets the worker paid correctly, and it gives the client enough detail to approve the invoice. When those two purposes are handled separately, you end up chasing the same hours twice.

A timesheet for labour hire or trades needs the worker's name and employee or payroll ID, the client and job or site reference, start and finish times with breaks, any allowances or overtime, job or cost codes, and a supervisor or client sign-off. Below is a template you can copy, a worked example, and the step-by-step approval process that moves a timesheet from the worker's hand to the client's invoice.

What a timesheet needs to cover

The fields on a timesheet depend on who reads it. Payroll needs the hours, the award classification and any loadings. The client needs to see the site, the dates, the person and the total hours they are paying for. Job costing needs a cost code so the labour lands against the right project.

A timesheet that serves all three includes:

  • Worker name and payroll ID. Payroll matches on the ID, not the name.
  • Client name. The entity being invoiced.
  • Job or site reference. Ties the hours to a project or location.
  • Week ending date. The period the timesheet covers.
  • Start time, finish time and break duration for each day. Enough to calculate ordinary hours, overtime and any broken shift allowances.
  • Allowances. Travel, meal, site, height or other allowances the award or contract requires.
  • Overtime hours. Separated so the client can see the premium rate component.
  • Job or cost code. So labour cost reaches the right project in the job costing system.
  • Classification or pay level. The award classification or agreed rate category.
  • Worker signature and date.
  • Supervisor or client sign-off and date. The person on site who confirms the hours.
  • Notes or comments. For anything unusual that payroll or invoicing will query later.

If your workers move between sites in one day, you need a line per site, not just a daily total.

Copyable timesheet template

Use this as a starting point. Add or remove columns to suit your award and your client's requirements.

| Field | Example | |---|---| | Worker name | (worker name) | | Payroll ID | EMP-0147 | | Client | (civil contractor client) | | Job / site reference | HLC-2241 Bridge Rd Drainage | | Week ending | 29 Nov 2026 | | Classification | CW3 (Civil Construction) |

Daily detail (one row per day, or per site if the worker moves):

| Day | Site | Start | Finish | Break | Ordinary hrs | OT hrs | Allowance | Cost code | Notes | |---|---|---|---|---|---|---|---|---|---| | Mon | Bridge Rd | 06:00 | 14:30 | 0:30 | 8.0 | 0 | Travel | HLC-2241-LAB | | | Tue | Bridge Rd | 06:00 | 15:00 | 0:30 | 8.0 | 0.5 | Travel | HLC-2241-LAB | | | Wed | Bridge Rd | 06:00 | 16:00 | 0:30 | 8.0 | 1.5 | Travel | HLC-2241-LAB | Rain delay AM | | Thu | Bridge Rd | 06:00 | 14:30 | 0:30 | 8.0 | 0 | Travel | HLC-2241-LAB | | | Fri | Bridge Rd | 06:00 | 14:30 | 0:30 | 8.0 | 0 | Travel | HLC-2241-LAB | | | Sat | | | | | | | | | | | Sun | | | | | | | | | | | Total | | | | | 40.0 | 2.0 | | | |

| Approval | Name | Signature | Date | |---|---|---|---| | Worker | (worker) | (signed) | 29 Nov 2026 | | Supervisor / client rep | (client site supervisor) | (signed) | 29 Nov 2026 |

Worked example: one week, start to finish

For example, say a labourer works a standard week on a civil construction site for a civil contractor client. The timesheet above shows 40 ordinary hours and 2 overtime hours across the week.

What payroll needs from this timesheet:

  • 40 ordinary hours at the CW3 rate
  • 2 overtime hours (the first 2 hours of daily overtime at time-and-a-half under the Building and Construction General On-site Award, for example)
  • 5 days of travel allowance
  • The employee's payroll ID to match the right record

What the client invoice needs:

  • 40 ordinary hours at the agreed charge-out rate
  • 2 overtime hours at the agreed overtime charge-out rate
  • Travel allowance at the on-charged rate, if the contract allows it
  • The job reference HLC-2241 so it appears on the right cost code in the client's system
  • The signed timesheet as backup

What job costing needs:

  • 42 hours of labour against cost code HLC-2241-LAB
  • Allowances against HLC-2241-LAB (or a separate allowance code)

One timesheet feeds three outcomes. When those three are connected, the numbers should agree.

The approval process, step by step

The approval steps move the timesheet from the worker through to a paid invoice. Each step adds a check that is harder to fix later if it is missed early.

Step 1: Worker completes the timesheet

The worker fills in start, finish and break times each day. They note any overtime, allowances and the site or cost code. They sign and date it at the end of the week (or the end of the shift, depending on the arrangement).

The common problem here is rounding. A worker who writes "8 hours" instead of actual start and finish times removes the detail payroll needs to calculate overtime correctly.

Step 2: Supervisor or client signs off

The supervisor or client representative on site confirms the hours are correct. This sign-off is the evidence that the client agreed to the hours before they appear on an invoice.

If this step is skipped or delayed, the invoice arrives without proof the hours were worked. That is the most common reason client invoices are queried.

Step 3: Timesheet reaches the office

The signed timesheet arrives at the labour hire or trades office. Someone checks it for completeness: are the job code, classification and allowances filled in? Are the totals correct? Does the sign-off match the client's authorised approver list?

Missing fields at this stage mean a phone call back to site, which costs a day.

Step 4: Payroll processes the hours

Payroll enters (or imports) the ordinary hours, overtime and allowances, applies the award rates or agreed rates, and runs the pay. Under Payday Super, the super contribution for this pay run is due within seven business days of the pay date.

If the classification on the timesheet does not match the employee's record in payroll, the pay will be wrong. This is where a payroll ID matters more than a name.

Step 5: Invoicing bills the client

The same hours that went to payroll now appear on the client invoice, at the charge-out rates in the contract. The invoice references the job, the week, the worker and attaches the signed timesheet.

If the invoice is built from a different source than the payroll data, the hours can drift apart. That drift is what causes payment disputes and margin leakage.

For a detailed look at how that drift happens, see Timesheet hours don't match payroll or the client invoice.

Where it breaks: timesheets, payroll and invoicing in separate systems

The approval process above looks clean on paper. It falls apart when the timesheet, payroll and invoicing systems are not connected.

Common breakdowns:

| What goes wrong | Why it happens | What it costs | |---|---|---| | Approved hours on the invoice differ from payroll hours | Hours are entered separately into payroll and the billing system | Disputed invoices, delayed payment | | Overtime calculated differently on the pay and the invoice | Payroll applies award rules; invoicing uses a flat total | Margin lost on overtime hours | | Allowances on the pay but not on the invoice | The person doing invoicing did not see the allowance column | Revenue left on the table | | Client queries an invoice two weeks after the work | The signed timesheet was not attached or was lost | Staff time chasing paperwork | | Timesheet approved but not entered before payroll cut-off | Paper or email timesheets arrived late | Worker paid in the next cycle; Payday Super deadline at risk | | Cost code missing or wrong | Worker left the field blank; nobody checked | Labour cost sits in overheads instead of the job |

The core issue is double entry: the same hours typed into two or more systems, by different people, at different times. When you type the same number twice, eventually the two copies disagree.

If your workers are in trades or construction and you are adjusting for Payday Super deadlines, Trades timesheets to payroll under Payday Super covers how the timing chain works.

What it looks like when it is connected

When one approved timesheet feeds both payroll and invoicing, three things change.

First, the hours on the pay and the hours on the invoice always match, because they come from the same record. Disputes about "we approved 38 hours but you billed 40" go away.

Second, the data reaches the right cost code without anyone retyping it. On Monday morning you can see last week's labour cost by job, not three weeks later when someone gets around to the reconciliation.

Third, the approval trail is in one place. When the client queries an invoice, the signed timesheet is attached to the same record, not in someone's email or on a clipboard in the site shed.

This is the kind of connection business process automation is built for: not replacing people, but removing the step where someone retypes the same hours into a second system.

If your labour hire operation is growing and admin is growing with it, Why the office grows with every placement explains why scaling the headcount does not fix the problem.

Frequently asked questions

Does the timesheet need to be on paper?

No. Electronic timesheets (a form, an app or even a photo of a site docket with a digital sign-off) are fine (how to choose timesheet and rostering software), as long as the worker and the supervisor or client representative both confirm the hours and the record is kept. What matters is the sign-off, not the format.

What if the client and the worker disagree on the hours?

Resolve it before the timesheet reaches payroll. The worker gets paid based on the hours they actually worked (the employer's obligation under the Fair Work Act), but the invoice should reflect what the client approved. If the two differ, you need a conversation, not a workaround in the system. Keep records of both versions.

How long should timesheets be kept?

The Fair Work Act requires employee records (including hours worked) to be kept for seven years. If timesheets support client invoices, your contract or the ATO's record-keeping rules may also apply.

Can one timesheet feed both payroll and the client invoice?

Yes. That is the point of connecting the systems. The approved timesheet is entered or captured once, payroll draws the pay data from it, and invoicing draws the billing data from the same record. The rates differ (award rate vs charge-out rate), but the hours and the job reference are the same.

What about workers on multiple sites in one day?

Each site needs its own line on the timesheet, with its own start, finish and cost code. A single daily total split across sites after the fact is guesswork, and the job costing will be wrong.

If you want to see how labour hire and trades businesses across Australia are connecting their timesheet, payroll and invoicing systems, visit our labour hire industry page or book a free initial chat to talk through how it would work for your setup.